real-estateintermediatev1.0.0

Due Diligence Checklist Re

Execute a disciplined 10-21 day real estate due diligence period with prioritized inspections, ordered contingency removal, and tight timeline tracking

Due diligence is the only window in the transaction where the buyer has asymmetric information rights — they can inspect, investigate, and withdraw. Miss an item, miss a deadline, and that leverage is gone. This skill is the end-to-end DD playbook: what to check, in what order, by which date, with which specialist, and how to respond with the results.

Phase 1: Intake — Define the DD Scope Before Ordering Anything

Not every property needs every inspection. A 2018-built condo in a well-managed HOA needs a very different DD than a 1952 rural home on well and septic with a detached workshop. Match scope to property.

1.1 Deadline Reality Check

  • [ ] Contract ratification date: [DATE]
  • [ ] Total DD / inspection period: [DAYS]
  • [ ] DD expiration date (by end of business, specific time): [DATE / TIME]
  • [ ] Business days or calendar days in contract: [TYPE]
  • [ ] Weekend and holiday buffer built in: [Y/N]
  • [ ] Extension mechanism in contract: [TERMS]

1.2 Property Risk Profile

  • [ ] Year built: [YEAR]
  • [ ] Last documented renovation: [YEAR]
  • [ ] Property type (SFH, condo, townhome, multi, new construction, historic): [TYPE]
  • [ ] Water source (municipal, well, shared well): [TYPE]
  • [ ] Sewer (municipal, septic, cesspool, shared): [TYPE]
  • [ ] Heat source (gas, oil tank, propane, electric, heat pump): [TYPE]
  • [ ] Oil tank buried or above-ground or removed: [STATUS]
  • [ ] Basement/crawl type and known moisture: [DETAIL]
  • [ ] Foundation type: [TYPE]
  • [ ] Roof age: [YEARS]
  • [ ] Flood zone designation: [ZONE]
  • [ ] HOA/condo association: [Y/N]
  • [ ] Radon risk area: [Y/N]
  • [ ] Termite/WDO region: [Y/N]
  • [ ] Stucco/EIFS exterior (moisture testing protocol): [Y/N]
  • [ ] Lead paint vintage (pre-1978): [Y/N]
  • [ ] Asbestos risk vintage (pre-1980): [Y/N]

1.3 Buyer Priorities and Limits

  • [ ] Buyer budget for inspections: $[AMT]
  • [ ] Buyer deal-breaker list (items they will walk for): [LIST]

Get the full skill

Unlock Due Diligence Checklist Re and 600+ other skills

Get Access — $8/month

The Library

Unlock this skill +
600 more.

Subscribe for $8/month. Paste any of 600+ structured playbooks into Claude. Cancel anytime.